| |
Every customer engagement begins with an extensive consulting phase to determine the output specifications. The insights are then mapped into the project timeline, taking in account the resources and the infrastructure necessary.
Facilities
Infrastructure available include:
- A 2500 sft. work space
- 65 nodes with Servers and Data back-up
- High Speed Scanning
- Ups and Generator facility in case of power disruptions
- A 2 mbps Broad Band DSL based Internet facility (2 connections)
- A 55-member Production and QC team comprising of engineers in the electrical and mechanical domains including a 15-member core team of engineers having 8+ years of data cleansing, classification and enrichment experience.
Process Hygiene
In a data production environment, good processes ensure quality output. Our processes have been designed to ensure high quality, optimal throughput, end-to-end traceability. Progress & workflow is tracked on a regular basis for up-to-date reporting. We have achieved very high quality levels with these processes on complex technical data and our error rate is as low as 200 PPM with an RFT index of 97%.
Yukthi Datasoft follows a robust and well-tempered process in its data conversion business. At the launch of any project, the available data is analyzed, the output specifications are finalized, and data is mapped and given to the production team for the next operation. During the production stage the project specifications are logged and the production is tracked at every stage for validity and integrity. The data is backed-up periodically, and the final output is validated by an independent Quality Control team. The same is delivered in the required format within the promised deadline.
|